Our crane and heavy haul teams worked together on a 60,000 lb. drum. It was transported to and set in Great Salt Lake Minerals. The preliminary work involved several weeks of engineering, permitting, widening a road, and planning for safely. It should be noted, the drum has a width of 22’ and a height of […]