Vernal Plant

Industry: Industrial

Vernal Plant

Mountain Crane played a pivotal role in phases 3 and 4 of a compressor station recently. With our 110-ton RT crane, versatile Carry Deck, and consistent use of a 275-ton crane throughout the month-long project we were able to provide crane support in the piping and equipment setting. The final lift was the flawless installation […]

Read More
Heavy Transport

Mountain’s heavy haul team transported two 20’ tall and 36’ wide drums. Skilled operators carefully maneuvered this huge load through some tight spots at a Utah industrial site.

Read More
Lifting a 190,000 lb Compressor

This project was a perfect collaboration of our crane crew & heavy haul division. This 190,000 lb compressor is 22’ wide and was transported in on our 6 lines of Goldhofer THP and pulled by our Osh-Kosh M1070 military tugger. It was then picked up and placed by two of our 350-ton cranes.

Read More
Lifting a 280,000 Pound Boiler

Mountain had the opportunity to move a 280,000 pound boiler. In addition to providing the engineering on the lifting lugs system for this project, Mountain was pleased to provide the lift plans for the crane. While looking at this project, we chose the Manitowoc 2250 Crawler and the 6300L AT as the right tools for […]

Read More
Refining the Process

With the ease and convenience of our heavy haul experts, the best engineers, and the top notch crane crew we have refined the process of construction. These pictures show a great example of this. It all began with careful planning & engineering, then it was time to execute! With our Goldhofer, the pipe rack modules […]

Read More
Mining Project

In the process of building a new plant. When this project is completed, it will allow the mine to produce the metals as a final product instead of shipping raw concentrates to other companies for final processing, a feat that they have not been able to do previously. Mountain Crane has been involved with this […]

Read More
Power Plant Placement

Our 275-ton, AT crane placed two switch gear housings for the local power company recently. Each piece weighing approximately 55k lbs, was hauled in and carefully set in place for storage.

Read More
Refinery Work

Although refinery work is nothing new to our team, the unique project just completed at a local refinery was anything but ordinary. Our team was responsible for the storage, transport, and placement of 138 pieces of major equipment for the refinery. Every module and piece was successfully set without incident and ahead of schedule. A […]

Read More
Transformer Placement

Our crane and heavy haul divisions teamed up to make this job an easy and successful process for our customer. We delivered and placed this 119,050 lb transformer in Randolph, Utah.

Read More
Two Crane Pick or Pick and Trip

The Mountain team recently offloaded and tripped a 230,000 pound evaporator. The lift involved our skilled team operating our Grove 6300L (350 ton) and Liebherr LTM 1400-7 (500 ton) cranes. In order to execute these picks successfully it requires great communication between our operators and signalmen. The engineering department at Mountain also provided a great […]

Read More
outline Logo black

READY TO START YOUR PROJECT WITH US?

Mountain Crane offers one of the largest fleet of cranes in the Mountain West! Our diverse fleet has the right crane for your job!

REQUEST A QUOTE