Replacing a 36" to 42" carbon monoxide gas pipe is challenging enough. Doing it with limited overhead clearance and obstructions below is a whole new level of complexity. The project required removing the pipe quickly and safely. With overhead clearance too tight for crane lifts and obstructions below ruling out jack and slide operations, we had to think differently. Our team engineered a plan using a Self-Propelled Modular Transporter (SPMT) combined with a special clamp system—a setup designed to handle the clearance limitations and ensure safer conditions at elevated heights. Despite the complexities, we mobilized and executed the plan ahead of schedule.
"Mountain Crane went above and beyond to develop an innovative rigging solution, demonstrating creativity and precision to safely execute the removal and installation of a complex project." -Billings Plant Manager, Par Pacific
Mountain Crane offers one of the largest fleet of cranes in the Mountain West! Our diverse fleet has the right crane for your job!