PROJECT OVERVIEW

With the ease and convenience of our heavy haul experts, the best engineers, and the top notch crane crew we have refined the process of construction. These pictures show a great example of this. It all began with careful planning & engineering, then it was time to execute! With our Goldhofer, the pipe rack modules ranging from 70K lbs to 100K lbs, were moved into place and prepped for the pick. Over a two week period we utilized our 500 and 900 ton cranes both in luffer to pick and set all 6 of these massive pieces. All of this was done as a shutdown at the refinery so communication and coordination between the shutdown crew, the refinery, and new construction team was critical.

Project Stats:

RELATED PROJECTS